ELDEMA EPOXY

A guide for fundis · 11 Nov 2026

How to prepare an itemised epoxy quote in Kenya.

A useful quote explains what the client pays for, not just the final number. Start with the measured area, then build the materials breakdown, labour and your pricing allowance.

This guide is for preparing a quote yourself. Eldema Epoxy’s quoting tool is not yet available. The example below is illustrative, not a live quote or verified founder default rates.

Measure the area and define the work

Measure each rectangular section in metres. Multiply length by width, then add the sections to get the total in m². Record the measurements so you can check them later. Measure steps, edges or vertical surfaces separately if included.

Name the system and the work included: surface preparation, primer, resin and hardener, and topcoat where required. Inspect the substrate before fixing your price. Repairs, moisture treatment and removal of existing coatings can change the scope. State exclusions clearly rather than absorbing unknown work into the floor price.

Turn coverage into material quantities

Use the chosen product’s technical data sheet, not a generic epoxy coverage figure. Check whether coverage is stated per coat, for the complete system, or at a specific thickness. Keep units consistent: litres, kilograms and kits are not interchangeable without the supplier’s information.

For coverage stated in m² per litre, divide area by coverage to find litres required for that coat. For consumption stated in kg per m², multiply area by consumption to find kilograms required. Account for each specified coat without counting the same layer twice. Add a justified wastage allowance and round purchases to available pack sizes.

Confirm the resin-to-hardener ratio from the manufacturer. Do not change it to stretch coverage. The sample below does not supply quantities or coverage rates; it cannot determine what to buy for your job.

Price materials and labour separately

Get current supplier prices for the exact products and pack sizes. Multiply purchased quantities by unit costs, then show each material line in KSh. Confirm whether delivery and applicable taxes are included. Include consumables and equipment costs where they apply.

Build labour from the work required, crew size and time on site. Include preparation and return visits between coats, not only application time. If using a labour rate per m², check that it covers this job’s conditions. Keep transport, equipment hire and other job costs visible rather than treating them as profit.

Illustrative example · Epoxy, 60 m²

A breakdown whose total you can check

These figures reproduce the existing landing sample. They are not supplier prices, recommended rates or verified founder defaults. No quantities, coverage assumptions or real client job are represented.

Primer
KSh 14,400
Resin and hardener
KSh 38,400
Topcoat
KSh 21,600
Materials subtotal
KSh 74,400
Labour
KSh 54,000
Cost subtotal
KSh 128,400
Markup, 20% of cost
KSh 25,680
Total
KSh 154,080

Materials: KSh 14,400 + KSh 38,400 + KSh 21,600 = KSh 74,400. Add KSh 54,000 labour to get KSh 128,400. Adding KSh 25,680 produces KSh 154,080, or KSh 2,568 per m² for this illustration only.

Do not confuse markup with margin

The landing sample labels its addition “Margin, 20%”. Its arithmetic actually adds 20% of the cost subtotal: a markup. KSh 128,400 × 20% = KSh 25,680. That addition is about 16.7% of the KSh 154,080 selling price.

A gross margin percentage is measured against the selling price, not the cost. To calculate a selling price for a target gross margin, divide total cost by one minus the margin expressed as a decimal. Neither calculation guarantees net profit. Any omitted overhead, tax or unexpected job cost still reduces what you keep. Choose your own allowance after checking the full costs; the example’s 20% is not a recommendation.

Check before sending

Add your business name, contact details, client name, site, quote date and validity period. State the system, area, included work, exclusions, payment terms and any applicable tax treatment. Recheck every subtotal and the final total. Explain what would require a revised quote before work begins.

Compare the layout with the existing sample quotes. Those are static illustrations, not quotes you can edit or send from Eldema. Return to the Eldema Epoxy landing page for the planned tool’s overview.

Eldema Epoxy’s site and business are built and run by AI agents on NanoCorp.